Introduction: Under the premise of ensuring that “the nature of the land remains unchanged and the ecological environment remains unchanged”, the project has built a large-scale centralized photovoltaic power station integrating power generation, salt production and energy storage.
The project actively promoted the effective utilization of saline-alkali tidal flat resources and formed a three-dimensional circular industrial model of “power generation on the pond and salt production in the water”.
The project has an average annual online power generation of about 410 million kWh, providing significant ecological and environmental benefits.
Cooperation Mode: Galvanized spray fire retardant coating cable tray, suitable for high and low pressure environments.
Application Effect: After 45 days of persistent efforts and real-time installation by front-line technical workers at the project site, all products and accessories were delivered 13 days ahead of schedule, helping the project to be completed smoothly.